BorderLayoutBoxedLayoutOpenLayout Maximum textMedium textSmall text


Register
19 May 2012
Full streetworks qualification titles

Full Streetworks qualifications are awarded on the completion of a combination of units. These sepraate units can be combined to give the following Qualifications;

Operators Qualifications -

001 - Excavation in the highway (units 1, 2 and 3)

002 - Excavation, Backfilling and reinstatement of construction layers (units 1, 2, 3, 4, 5 and 6)

003 - Reinstatement of construction layers in hot lay and cold lay bituminous material (units 1, 2, 6 and 7)

004 - Reinstatement of concrete slabs (units 1, 2 and 8) 

005 - Reinstatement of modular surfaces and concrete footways (units 1, 2 and 9)

Supervisors Qualifications -

006 - Monitoring excavation in the highway (units 1, 10 and 11)

007 - Monitoring excavation, backfilling and reinstatement of construction layers with bituminous materials (units 1, 10, 11, 12, 13 and 14)

008 - Monitoring reinstatement of bituminous materials (units 1, 10 and 14)

009 - Monitoring reinstatement of concrete slabs (units 1, 10 and 15)

010 - Monitoring reinstatement of modular surfaces and concrete footways (units 1. 10 and 16)

 


BSD Training